Skip To Main Content
Skip To Main Content

University of Maine Athletics

Maine

master-plan-header


UMaine Indoor Facility


The existing indoor dome facility will be replaced with a brand new dome structure, complete with the latest upgrades and first-rate materials. The dome will receive expansions and a new expanded synthetic turf field inside. The newly expanded facility will include 58% more usable space than the existing domed structure. The enclosure structure will be a next-generation insulated bubble, equipped with the latest features to protect from the elements and a 25-year life expectancy.


 
SpeedDome_Exterior


 
SpeedDome_Interior




 
University of Maine Athletics loading logo