The 90,000-square-foot, $9.5 million complex officially opened on March 31, 2023 and features a synthetic turf playing surface, bleacher seating for up to 500 patrons along with chairback seats in the center of the stadium layout located between each brick dugout, an enclosed press box located directly behind home plate with three media towers around the stadium, LED stadium lights, bullpens down each foul line, and a 3,500-square-foot, two-lane batting pavilion.
On Oct. 19, 2024, UMaine President Joan Ferrini-Mundy approved naming the softball complex the "Pierre & Catherine Labat Softball Complex" following a transformation $16 million
In recognition of the substantial gift, UMaine President Ferrini-Mundy has approved naming the university's softball complex after a
$16 million donation from the estates of Black Bear alumnus Pierre "Pete" Labat and his wife, Catherine Clair Labat.